"Remediation Plan Proposed For The Gowanus Batcave"

1 Comment -

1 – 1 of 1
Anonymous Anonymous said...

The finished grade of the site work is all important here. Contaminated soil should be removed. But new soil levels need to be considered. The finished grade should be the original grade level that was engineered for the canal and regional drainage.
FEAM staff have admitted that the current fill on that site may have been the reason the Sandy storm Surge was deflected all the way up to flood the Gowanus Houses.

January 7, 2014 at 7:41 PM