[Image]
Deadlines require that I need to assemble and paint my Swan-necked trade ship, the "Ceres", over the Xmas/New Year period, whilst simultaneously writing another article, and stuffing the turkey. I fear that there won't be much time left over for blogging...
The piece on the left is going to be the stern-castle. I need to sculpt a swan on the wire frame, and add the characteristic Roman railings around the outside. I have a mate working on making the railings, and a plan "B" in case his technology can't cut them.
Later I will need to assemble the masts, build a deck-cabin with bridge on top, and scratchbuild steering oars.
The expensive but beautiful Grand Manner equivalent resin casting is looking more appealing by the moment!
No comments yet.
Close this window