tag:blogger.com,1999:blog-290142320030812812009-02-21T06:23:20.668-05:00Bacon LibraryBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.comBlogger26125tag:blogger.com,1999:blog-29014232003081281.post-8057391720459879132008-01-30T14:08:00.001-05:002008-05-15T15:44:43.601-04:00Changes still taking placeNow that the construction work is done, we are focusing on room use and furnishings.We have purchased and received donations to purchase several tables and chairs. Areas of the Library you might not have seen in years are now open. In the 1962 section we have created a computer "room" for the adult computers and a computer row for the Youth units.1 youth computer is being set up with new Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com1tag:blogger.com,1999:blog-29014232003081281.post-47231615559222383222007-10-20T14:49:00.000-04:002007-10-20T15:08:19.500-04:00FINALLY!We opened the entire library on Friday October 19th for the open house. We tagged along as part of the merchants 3rd Friday celebration and the Museum's halloween night. Over 370 people walked thru during the 3 hours. Anna Popovich told stories in the atticDown on the ground floor we were entertained by the music of Kim and Andy Kilburn. Desserts were prepared by staff and an owl planter was Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-26965401727582499652007-09-25T15:09:00.000-04:002007-09-25T15:32:17.576-04:00Getting down to the wireTwo more inspections to go and we should be moving furniture, offices and more with the use of an elevator!Painting is done except for touch ups, railing moved into place Windows stained, caulked and sealed. Areas in the Bacon house have been emptied and cleaned for new purposes. Side hall "carriage" door Simmons Room--The Friends of the Library Reading RoomWhat used to be outdoors is now Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-51137084829519383072007-09-10T11:04:00.000-04:002007-09-10T11:22:57.472-04:00Finishing touchesIt's been a long haul, but we are now looking at the LAST WEEK (weather permitting) of work on the elevator construction. All the floor tile is in.The painters are priming and applying first coats of paint to the walls and ceilings and staining the new woodwork.We hope to have stair railing and treads in on Wednesday. Thursday we plan to have some cement replaced out front and the Tattrie bench Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-9925439639026070992007-08-28T16:25:00.000-04:002007-08-28T16:42:55.609-04:00I'm told daily we are in the home stretch. I hope so! The outside is looking neater as dirt begins to swept up and leveled. All the windows are in. 99.9% of the drywall is ready! Painter is to start tomorrow! Carpeting in on Thursday--keeping my fingers crossed.Once painting and flooring done I'll add photos. We are ready to move offices soon and then start on relocating the Local History rooms. Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-22313729666305509092007-08-09T17:48:00.000-04:002007-08-09T18:12:48.636-04:00Interior ProgressLuckily the rainy days did not stop the interior work.We have doors on the elevator.Drywall is going up on the walls and ceilingand windows are being installedA rooftop summit was held to closely look at the roof edging. Even Bob "the builder" took part and actually lent a hand!We are preparing existing areas ofthe house for public use with sanding and stainingof 2 original pine floors on the 2ndBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-49643417153629692582007-07-20T15:28:00.000-04:002007-07-20T15:49:47.318-04:00Rain didn't stop masons for long!Lots of workers in this week with elevator installers, electricians, carpenters and the masons.The storms moving in and out didn't stop work for long. Corner blocks to be cut These blocks are being inserted to give the new wall the look of the 1897 corner of the Ford-Bacon house. The elevator floor was installed and it is able to travel from the ground floor up to the 3rd floor level as the Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com3tag:blogger.com,1999:blog-29014232003081281.post-84569681045073579362007-07-13T13:57:00.000-04:002007-07-13T14:14:00.868-04:00What a week!Color choices for wall, ceilings, exterior sills and a small area to be covered with shakes.It looks like a usable space almost!Sometimes through the process we have all thought Now What?Tom and Graham seem perplexed.The carpenter keeps working on the ceiling and soffit areasThe guys from Schindler Elevator arrived and began opening their boxes and setting up scaffolding in the elevator shaft. AtBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com1tag:blogger.com,1999:blog-29014232003081281.post-84094642858899654092007-07-06T16:12:00.000-04:002007-07-06T16:28:27.948-04:00Workers everywhere. Today we had roofers, carpenters, mason, electrictians, superviser and architect all working at one time.Fresh mortar piled on for the rising walls.This is not a doorway, just the opening for ground floor window. Electricians began wiring for elevator shaft and mechanical room.A view of the 3rd floor landing and just a peek at the enclosed 2nd floor area.We expect elevator installation to begin Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-10630855008471796622007-06-28T16:04:00.000-04:002007-06-28T16:17:23.917-04:00Brick by brickYesterday 2 rounds of thunderstorms wiped out the work day. It was more of a wipe up day.Temperatures lower today and work resumed. The brickwork on Vinewood risesI was able to climb out on the scaffolding at the 2nd floor level as Tom showed me the wire "locks" used every 6 rows to attach brick to cinder block! The carpenters are busy on the roofline and placing aluminum studs for interior wallsBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-83637838151169307492007-06-22T14:56:00.000-04:002007-06-22T15:27:38.801-04:00Slowly coming togetherThis week carpentry began for the roof lines. Steps were prepared and poured.Best of all, the exterior brick arrived and the masons returned to start the courses. One window area has the keystone and arch laid.As we proceed with new construction, unfortunately the old Wyandotte Theatre is almost at going, going, gone status!Other movie houses in town were the Majestic and the Rialto. Perhaps you Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com3tag:blogger.com,1999:blog-29014232003081281.post-44785562068790308202007-06-13T10:56:00.000-04:002007-06-13T11:18:04.247-04:00Iron and floorsSaturday the iron workers did a herculean job framing out the landing areas. Monday and Tuesday, masons continued North wall block and floor decks were installed.Wednesday morning the cement truck and piping system arrived for the 1st pour onto the 3rd floor landing.Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-41778774320267370932007-06-08T13:31:00.000-04:002007-06-08T13:40:21.656-04:00Window framesMore progress--part of the exterior walls are constructed and window openings taking shape for 3 on the north side of structure.Opening to the 3rd floor entry coming off the landing--yet to be built.And with all the work up above, the dumpsters get filled and replaced often even in a tight squeeze by the utility pole.We are assured that steel work begins on Saturday and cement to be poured on Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-68675017448302037422007-05-31T14:28:00.000-04:002007-05-31T14:50:50.641-04:00Are we there yet?Only a few more rows of blocks and we've made it to the top of the shaft! Thursday morning and the last rows fitted into place. This phase is done. The boards, mortarboards, levels, water containers all come down. The scaffolding gets disassembled. Next come a few shorter walls and Monday the demolition guys return to prepare hall openings.Ironwork should be soon!Please use caution when you Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-42391642282688618782007-05-22T17:12:00.000-04:002007-05-22T17:21:33.095-04:00Second floorBlock by block the elevator shaft reaches each level. Ground floor, 1st floor and now the second floor is about half way there.Painstaking work moving blocks and mortar and always measuring. Today they broke out a new set of levels and got the other 2 helpers up the scaffold to move blocks and trim or smooth mortar.Looks more like a tower for Rapunzel and the white pickups parked below could be Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-75088123659752193532007-05-16T14:47:00.000-04:002007-05-16T15:05:09.165-04:00Above groundQuick moving thunderstorms interrupted work briefly, but the hardy masons were back at work. We are 7 or 8 blocks above ground level and there is a "door" for the ground floor entry.Preparations for next level underway as guides attached to west wall.Electricians out to place boxes and mark where access to new construction will break through. We are constantly asked what's on the third floor? Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-21760233702066620462007-05-09T16:34:00.000-04:002007-05-11T12:52:22.706-04:00ProgressSunshine greeted the workers for several days and we watched as the foundation walls grew. Tom guided the placement of each block.After this section was to the correct height, the shaft area received a coating of waterproofing and we wait for the inspector.A sample of the block wall was constructed for inspection as well as the exterior brick wall. We were able to check the mortar color against Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-35424621385484769572007-05-03T15:01:00.000-04:002007-05-03T15:31:16.213-04:00Sunny work days help the progress.Foundation masonry started this afternoon with the placement of the 1st row of blocks.Blocks arrived on a flatbed and then carefully unloaded and stacked in the front parking area. This orange vehicle was used to move blocks from stack to the work area.A new work crew in today with the mason.Hopefully next week we'll see some structural steel arrive.Schedule has slipped a few days. It is excitingBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-63574793237079050142007-04-30T14:47:00.000-04:002007-04-30T15:06:51.825-04:00Work resumesApril 26-30, 2007Wet weather hindered the time line and as soon as it stopped raining back to work.The flattened area was filled with wooden frames, rebar and chalk lines.On the 30th it took 2 loads of cement to fill in the frames.A beautiful day for work.Supervisors adding words of advice!We expect to see a scissor type lift arrive to begin a wall possibly this week!Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-77676596632441635232007-04-24T11:14:00.000-04:002007-04-24T11:41:37.365-04:00Bottomed outOnce again the jack hammers and 2 pieces of equipment to dig down to the lowest point. Foundations expected to be poured later this week.Our site supervisor, Tom, is optimistic that things will move forward quickly. Space is tight, "but we'll manage". The cable line might have to be moved to facilitate the iron beams lifted in by crane. Piles of sand and dirt are growing and parking spots in the Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-24213778220546209842007-04-19T17:19:00.000-04:002007-04-19T17:35:53.741-04:00The pounding stops for now.Beams removed today, water line cut and capped, more cement removed. We get a day of rest on Friday before footings go in on Monday. Always weather permitting.Someone asked about large machines--the largest we expect is a crane to move the new iron beams.The turkey comment about being lost--people tell me it was a female turkey as the wattle was not as big as a male would have, and the bird was Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com0tag:blogger.com,1999:blog-29014232003081281.post-74755797622541990792007-04-18T15:49:00.000-04:002007-04-18T16:32:58.953-04:00Wild turkey sightingMore jack hammers, cement saws and pounding to break up the slab that formed the foor of the hall.Back hoe in to dig out roots and carefully locate the water line that wasn't marked out by Miss Dig etc. A line was found about 5-1/2feet down and will "not" interfere with excavation area. The outside spigot will be cut and capped. We were closed when the dust streamed in and the noise was too loud Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com2tag:blogger.com,1999:blog-29014232003081281.post-31199947506272695582007-04-17T09:48:00.000-04:002007-04-17T15:13:50.120-04:00Look what I found!Jack hammers, pile driver and shaking buildings today as the remainder of the ramp is removed.Bet this guy was surprised when he turned aroundThe others managed to escape when the going was good, guess they couldn't stand the sound.Definitely a day for pardon our dust, by 1PM you could see dust seeping through the interior temporary wall. So major work was halted.Supervisor and demo crew couldn'tBacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com2tag:blogger.com,1999:blog-29014232003081281.post-62036942780964135472007-04-13T09:36:00.000-04:002007-04-13T12:55:47.045-04:00Don't try this at home.As the wall comes down it has been something of a balancing act for the workers.There is a lot of careful hand work with crowbars, picks and jack hammers. Loosen the brick and cement block, pry out, heave it down. Next peel back the wire mesh and plaster wall.Then we get to an outdoor hose spigot--STOP, where's the shutoff? Get out the heavy duty jackhammers to attack the ramp base.What will it Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com2tag:blogger.com,1999:blog-29014232003081281.post-53312439891673707032007-04-12T08:34:00.000-04:002007-04-12T08:44:06.873-04:00Escaping dinosaursApril 12, 2007As the wall slowly comes down watch out for escaping dinosaurs held captive since 1988.The mural was created by a dedicated group of teens during the summer reading program. One more bite and leap of a few feet and off he goes.Our volcano has been huffing and puffing and once it erupts we'll have a level hall. Thanks to the teens for providing us with years of entertainment and Bacon Memorial District Libraryhttp://www.blogger.com/profile/04558329115650499489noreply@blogger.com1